MGT5PMT Case Study On Royale Pizza – Project Management

Royale Pizza – Project Management

  • Developing a Set of Relevant and Achievable Goals and Their Measurements

Goal setting is considered as a vital element of project planning (Andersen, Grude & Haug, 2009). As a project manager Royale Pizza project, it is imperative to see beyond the typical needs, timelines, and budgets and put emphasis on setting SMART goals; SMART stands for Specific, Measurable, Achievable, Realistic, and Time-bound (Lawlor & Hornyak, 2012). In addition, it is essential to have specific and clear project goals.

Broad Goal: Project management of ‘Royale Pizza’ renovation and expansion as the restaurant owners aims to serve other types of food, reduce their food waste, and increase their profitability by 25%.  

  • Specific: To complete the design, procurement and delivery, construction, installation and painting activities in 6 months with a budget of AU$40,000 approximately.  
  • Measureable: progress will be measured by conducting weekly meetings with the key stakeholders and other pertinent parties and progress report will be shared along with Gantt Chart representation. 
  • Achievable: this goal is very pragmatic and achievable if every member in the project pitches in. 
  • Relevant: Our goal is realistic because it has been carefully analyzed that design phase will be completed in 1 month with a planned budget of AU$ 5,000, procurement and delivery will take 2 months with a projected budget of AU$ 18,000, construction will take a month with a calculated budget of AU$ 7,000, installation and painting will be done in 2 months with a considered budget of AU$ 10,000.
  • Time-bound: It will be achieved during the next 6 months and performance will be measured by both our actions as well as the ensuing upshots.

 

  • Scope Statement for Royale Pizza and the Processes Used to Determine its Scope

Project scope, an element of project planning, encompasses ascertaining and documenting a list of particular project goals, deliverables, characteristics, functions, tasks, deadlines, and eventually outlays. In order to determine the scope of Royale Pizza renovation and expansion, key processes that will be followed are given below:  

  • Define the Requirements for the Expansion and Renovation of Royale Pizza

The main task is to successfully and efficiently renovate Royale Pizza and expand its food preparation and serving area by considering all the safety regulations and standards. As a project manager, I have discussed and included the following points in the scope of this project:

  • Renovation of floor 
  • Installation of air-conditioning system
  • Dust-free painting
  • Increasing compressor capacity
  • Professional cleaning of kitchen exhaust system
  • Purchasing of equipment including 3 deep fryers, 2 boilers, and 1 dough roller 
  • Point of sale system with installation of suitable software and hardware to run it
  • Removal of rear stairs
  • Purchasing of 2 new sets of chairs and portable table
  • Involve the Stakeholders

For the successful renovation and expansion of Royale Pizza, stakeholders will be involved very closely at different phases of the project scope. Shop owners will be the main stakeholders. Other parties that will be included in this project are technical managers, shop supervisor, installers, equipment suppliers, contractor, technical and safety compliance certification bodies, and project management consultant.  

Complete Solution

Need Urgent Academic Assistance?

Get Professional Help at Low Prices!

*
*
*


*

TOP
Order Notification

[variable_1] from [variable_2] has just ordered [variable_3] Assignment [amount] minutes ago.