CSM80006 Engineering Project Management Assignment Help
CSM80006 GROUP WORK ASSESSMENT (SEMESTER 2, 2019)
The group work assessment in this unit is for 40% weighting, which includes 2 parts (each worth 20%). Your individual contributions in all group work tasks will be checked.
This is Part 1 of your group work in this unit. The Part 1 include one task (20%).
The due date for this Part 1 of group work report is 10th September 2019 (2PM) in Week 6).
You are required to upload your reports in Canvas
You are suggested to consult with us in the lecture and tutorial sessions in Week 3 to Week 5 for a basic feedback of your interim reports (if any).
TASK 1 (20% WEIGHTING)
Your group should consider a forthcoming or ongoing project – e.g. from:
- https://www.nics.gov.au;
- https://www.ptv.vic.gov.au/footer/about-ptv/improvements-and- projects/train-and-rail/
- https://metrotunnel.vic.gov.au/rail-projects-victoria;
- http://westgatetunnelproject.vic.gov.au/about/;
- https://northeastlink.vic.gov.au/project;
- https://levelcrossings.vic.gov.au/projects;
- https://bigbuild.vic.gov.au/projects.
Project Management Plan Guidelines
You have to develop a “Project Management Plan” for the project selected by your group. Your project management plan report should cover management of following aspects:
- scope
- schedule
- cost
- communication
- change
- conflict/ dispute
- procurement
- quality
- risk
- safety
The written report of this “Group Work – Part 1” is not expected to be more than 20 pages.